Menu

mk Lift System

14-10-2015

Problem Definition In order to link a manufacturing process, during which a machine that is integrated downstream, functions at a slower speed but operates longer, a transfer system is required using a buffer zone for 40 pallets arranged in 5 levels and capable of transporting a total load of 10 tons. The lifting system must be designed for the transfer of products weighing 250 kg per pallet (600 x 800 mm). The pallet must be rotated 90ยบ and discharged onto the respective buffer level. mk Solution mk Lift System with base frame made of Profile Series 50. Lift unit with slewing ring and timing belt conveyor ZRF-P 2010 has a capacity of 300 kg. A counter weight and motor incl. holding brake for securing a load of up to 600 kg. Additional pegs at the transfer stations. Feed-in and storage area with reinforced SRF-P 2012 for a load of 300 kg/m and up to 1,200 kg total capacity, during 3 m/min. Video Files:

Visit the AdaptTech Manufacturing Solutions Ltd website for more information on mk Lift System

ENQUIRY FORM

More News

  • Adapt Tech Manufacturing Solutions

  • Pallet system for round battery cells

  • Sustainability through retrofitting for a pump manufacturer

  • Exciting Rebranding Announcement: mk Profile Systems to Trade as AdaptTech Manufacturing Solutions